We will be working on erosion control and slope restoration at the Sand Canyon pond breach site on the west side of the open space. This workday will require a short hike into the park while carrying tools. Primary tasks will include construction of rock stabilization structures, installation of erosion control matting, and disbursement of native grass seeds over the affected areas near the breach.
Advanced registration is required for all workdays. Please call or email to get your name on the list! Some days fill well in advance, so please register early (at least one week is suggested). We will send you an email with specific directions, maps, and release forms when you register.
Contact: Molly Mazel, Volunteer Coordinator, (719) 471-7736 ext. 4# or molly@rmfi.org